You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Ambrol di Ancol Dalam Tahap Penyelesaian

Collapsed Sheetpile Repair in Pademangan is Almost Complete

The collapsed sheetpile repair on the Ciliwung riverbank, RT 01/08 Ancol Urban Village, Pademangan, North Jakarta has entered finishing stage. It is targeted to be finished by the end of this year.

We're optimistic it can finish by the end of this year

Robert Rajagukguk, Section Head of River and Beach System stated that the finishing or second repair stage includes 50 meters length. The total repair of the sheetpile is up to 127 meters length.

Sheetpile Installed on the BGR Riverbank to Anticipate Inundation

"This repair work has touched 95 percent so far," he stated, Saturday (12/22).

The first repair stage that takes up to 77 square meters length was finished last November. It has been carried out since October 21, 2018.

"We're optimistic it can finish by the end of this year," he stressed.

Linked News
Popular News indeks
  1. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye972 personAldi Geri Lumban Tobing
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye934 personAldi Geri Lumban Tobing
  3. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye829 personFakhrizal Fakhri
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye710 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye607 personAnita Karyati